Compressor Refrigerant Oil Replacement


Release Date:

2014-08-02

(1) When draining the refrigeration oil from the compressor of a LOUDA reactor‑type low‑temperature chiller, first remove the compressor from the refrigeration system, ensuring that the discharge pipe, suction pipe, and service pipes are all open. For reciprocating piston‑type hermetic compressors, invert the unit and pour the oil into the container by aligning the low‑pressure suction line with the opening; for rotary hermetic compressors, invert the unit and pour the oil into the container by aligning the high‑pressure discharge line with the opening. Measure the volume of the drained refrigeration oil, and based on this measurement, transfer an equivalent amount of new refrigeration oil into a collection vessel—typically adding 10%–15% more than the original quantity to account for losses during the process.
(1) When draining the refrigeration oil from the compressor of a LOUDA reactor‑type low‑temperature chiller, first disconnect the compressor from the refrigeration system, leaving the discharge port, suction port, and service ports fully open. For reciprocating hermetic compressors, invert the unit and pour the oil into the container by aligning the low‑pressure suction line with the opening; for rotary hermetic compressors, invert the unit and pour the oil into the container by aligning the high‑pressure discharge line with the opening. Measure the volume of the drained refrigeration oil, and based on this measurement, transfer an equivalent amount of fresh refrigeration oil into a collection vessel. As a general guideline, add 10%–15% more oil than the original quantity to account for losses during the process.
(2) The method for charging refrigeration oil into compressors differs between reciprocating piston compressors and rotary compressors.
① The simplest method for charging refrigeration oil into a reciprocating, hermetically sealed compressor is to use a clean measuring cup and funnel to inject the oil directly through the compressor’s service port or suction line. Because the compressor ports are relatively small and the refrigeration oil is quite viscous, the charging process can be time‑consuming. Another approach involves drawing the oil into the system after starting the compressor; the specific procedure is as follows.
a. Take a clean, dry hose, connect one end to the compressor’s suction line (or service port), and insert the other end into a container holding the specified amount of refrigeration oil.
b. Start the compressor and manually block the service line (or suction line); the refrigeration oil will then be drawn into the compressor. Stop the compressor once all the refrigeration oil in the container has been exhausted.
Sometimes, during the refrigerant oil charging process, misty oil droplets may spray from the compressor’s discharge port. It is recommended to place a cup nearby before starting the oil charge; if oil sprays out, you can simply insert the discharge pipe into the cup.
② Charging the refrigeration oil into a rotary hermetic compressor: The specific steps for charging the refrigeration oil into a rotary hermetic compressor are as follows.
a. Pour the refrigeration oil into a clean, dry container in accordance with the specified filling quantity.
b. Seal the compressor’s suction line.
c. Connect the middle port of the dual‑manifold service valve to the compressor discharge line; place the hose connected to the high‑pressure port of the dual‑manifold service valve into an oil collection container, and connect the hose linked to the low‑pressure port of the dual‑manifold service valve to the vacuum pump.
d. Close the high-pressure port of the dual‑stage service valve, open the low-pressure port, and then start the vacuum pump to evacuate the compressor to a vacuum.
e. Close the low-pressure port of the dual‑stage service valve and open the high-pressure port; the refrigerant oil will then be drawn into the compressor automatically. Once all the refrigerant oil in the receiver has flowed into the compressor, the oil‑charging operation is complete.